March 3 Practice day w/ 1323

5940-2023-#3

From dual-pro

Beak at 13.1

12.58v starting

2:10 until brownout

18 shots taken

12.25 resting at end

Low peak of 6.3/6.4

5940-2033-#1

From dual pro

Beaked at 13.6 & 0.015

12.8v resting

23 seconds run (no brownout)

Low peak of 7.3v

12.8v testing

5940-2023-#4

From dual pro

13.229

0.014

12.88 resting

2:40 runtime

21 shots taken

12.1 resting

Low peaks 6.4

5940-2023-#8

From dual pro

Beaked 13.3 & 0.016

Resting 12.8

1:31 runtime

MAIN BREAKER BLOW @230 amps (ds log)

12.6 resting

(Reduced current limits)

5940-2023-#6

From dual pro

Beaked 23.218 @ 0.013

Resting 12.95

Resting 12.8

2:15 runtime

MAIN BREAKER BLOW (but came back)

Low peaks of 6.8 (single low of 5.5 is probably breaker blow)

Resting 12.3

(Breaker replacement)

5940-2023-#3

Beaked 13.393 & 0.016

Resting 12.75v

Runtime 2:08 (no brownout)

16 shots taken

12.3 resting

Low peaks of 6.5

5940-2023-#1

Beaked 13.29 & 0.016

Resting 12.83

(Used to tune trap)

5940-2023-#11

Beaked 13.183 & 0.013

Resting @ 12.8

Runtime 2:34

17 Shots taken

Resting 12.05v

Low Peaks of 6.8v