- SFR permission slip 📅 2024-03-06 ✅ 2024-03-07
- pay for cvr 📅 2024-03-26 ✅ 2024-04-22
- fix voltage display 📅 2024-04-03 ✅ 2024-04-08
- Replace Rio ethernet 📅 2024-04-03 ✅ 2024-04-10
- cleanup Ethernet on top 📅 2024-04-03 ✅ 2024-04-10
- switch shroud 📅 2024-04-03 ✅ 2024-04-10
- rpm shroud 📅 2024-04-03 ✅ 2024-04-10
- Rio Ethernet hold down 📅 2024-04-03 ✅ 2024-04-10
- design and build cross-breaker voltage tester 📅 2024-04-03 ✅ 2024-04-14
- get reimbursed ✅ 2024-04-14